Recycle containers for construction materials

Recycling and Reuse

The CSE building project diverted construction waste from landfills and incinerators, redirected recoverable waste to the manufacturing stream and redirected reusable material to the appropriate sites. The project diverted 294,000 lbs of 429,000 lbs (147 tons of 215 tons) of waste. Steel, masonry rubble, wood, plastic, cardboard and packaging, and gypsum wallboard were recycled.